BJ, you asked about my Generator installation and I happened to take pictures of the process.
The guys spent the morning g Into the afternoon doung wiring. First up was removal of my electric meter prior to installation of the transfer box on the outside of my house.
Then they mounted the Transfer switch box and put the electric meter back in place. During this time, power was turned off for obvious reasons. Once the meter was in place they turned it back on.
After that they did wiring through my basement to the switch box and out through the wall to the point where the Generator would be hooked up. The wood frame is where the gravel will go to set the Generator on. You can see a pipe sticking out of the wall with wires sticking out and my gas meter in the background. There is a black pipe attached to the gas meter and fastened to the house between it and the wires. That is the gas line to the generator
Once all the wiring work was completed, the base for the generator was put down and the Generator unloaded from the truck and set in place.
The poles sticking out of the pallet aided in helping load and moving the generator. They put a couple of lamps on the edge of the truck tailgate and slide the generator down to the ground.
All done
Any questions, please ask