So....making plans here for move in day and my goal is to have the remodel done before I move in so that I'm not stepping over
and around "project stuff" and of course the projects can't all be done in one day, but which would you do first cause I'd like to
put my list in chronological order. My first thought is buy what I need before I move the rv to a live in space, then take that
first month to get it all done. Here's the list so far, and if you think I forgot anything, let me know.
Tires
repack wheel bearings while tires are off
Batteries
take pictures of the connections before removing
the old ones.
Replace toilet - (paint while toilet is out)
Strip wallpaper from kitchen
tile around stove and paint kitchen
rip out carpet in living area
install new floor
repairman for fridge
paint ceiling
paint livingroom
paint bathroom - finish stripping out wallpaper
paint bedroom
anode for the hotwater heater
ridx for the septic tank...tank is probably dry after sitting for two year, dump a good 5 gals of water
in the tank and add some ridx to start the bacterial process.
wash and wax the exterior
wash windows
Shed
Skirting....required by insurance for full time living
Just hope I'm not over thinking everything but while I'm at sons, the rent is free and so is food and after the move-in of course there will be a
whole different budget.